|
|
|
|
|
|
|
|
|
|
|
|
• |
Place
presentations on the web for easy access
|
|
|
(http://www.ovsa.njit.edu/fasr/).
Please submit your
|
|
|
presentation
as soon as possible to designated ftp
|
|
|
location
(ftp://solar.njit.edu/pub/fasr).
|
|
|
• |
Write
up summary of this workshop
|
|
|
• |
Devise
science specifications and priorities based on
|
|
|
the
summary (and distribute for comments)
|
|
|
• |
Go
over specifications with small “tiger team” of
|
|
|
engineers to
define viable options
|
|
|
• |
Hold
small technical workshop by mid-summer, 2002,
|
|
to
flesh out viable options and start work needed to
|
|
|
explore
best one or two approaches.
|
|