|
|
|
|
|
|
|
|
|
To
arrive at a concrete implementation plan
|
|
for
the design and construction of FASR,
|
|
including
firm cost estimates, and a manage-
|
|
ment
plan for the construction phase.
The
|
|
goal
is to put us into a position to write a
|
|
successful
proposal for design and construction
|
of FASR.
|
|
|
The
proposal is for a 2-year study that started
|
|
on
2002 Mar 1 but we want to have the main
|
|
results
by August 2003.
|
|