2017 February: Difference between revisions

From EOVSA Wiki
Jump to navigation Jump to search
Line 3: Line 3:


'''17:35 UT''' Ant 14 was found to have a Dec PERMIT error on the current scan started 17:27 UT.  All scans prior to this are okay.  I will stop this run at 19:19 UT, in order to do a SOLPNT calibration and update the 2-m pointing, then test the result with another SOLPNT observation.
'''17:35 UT''' Ant 14 was found to have a Dec PERMIT error on the current scan started 17:27 UT.  All scans prior to this are okay.  I will stop this run at 19:19 UT, in order to do a SOLPNT calibration and update the 2-m pointing, then test the result with another SOLPNT observation.
'''19:23 UT''' The pointing calibration is complete on schedule.  Only one scan was messed up by the Ant14 PERMIT error.  A SOLPNT measurement will start at 19:30 UT.

Revision as of 19:25, 1 February 2017

Feb 01

11:27 UT Started another interferometric pointing run (CALPNT), which has been running since 08:16 UT without error. The wind is low, and Ant 14 is working well.

17:35 UT Ant 14 was found to have a Dec PERMIT error on the current scan started 17:27 UT. All scans prior to this are okay. I will stop this run at 19:19 UT, in order to do a SOLPNT calibration and update the 2-m pointing, then test the result with another SOLPNT observation.

19:23 UT The pointing calibration is complete on schedule. Only one scan was messed up by the Ant14 PERMIT error. A SOLPNT measurement will start at 19:30 UT.