2024 January: Difference between revisions

From EOVSA Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 108: Line 108:
|}
|}
==== Events ====
==== Events ====
Solar activity is moderate.


== January 06 ==
== January 06 ==
Line 123: Line 124:
|}
|}
==== Events ====
==== Events ====
Solar activity is moderate. 2 C-class flares observed by EOVSA at 16:30 and 21:57 UT. See dynamic spectra at [http://ovsa.njit.edu/wiki/index.php/Recent_Flare_List_(2021-)#January_2024 this link].


== January 07 ==
== January 07 ==
Line 142: Line 144:
!  Start Time (UT) || End Time (UT) || Antenna(s) || Comments/Reasons
!  Start Time (UT) || End Time (UT) || Antenna(s) || Comments/Reasons
|-
|-
| 00:00 || 23:59 || 7 || It has no VPOL power probably due to a failed optical link
| 00:00 || 23:59 || 7 || It has no VPOL power probably due to a failed optical link.
|-
|-
| 00:00 || 23:59 || 10 || It has no VPOL power probably due to a failed optical link
| 00:00 || 23:59 || 10 || It has no VPOL power probably due to a failed optical link.
|-
|-
| 00:00 || 23:59 || 13 || On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.
| 00:00 || 23:59 || 13 || On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.
Line 151: Line 153:


==== Events ====
==== Events ====
Solar activity is moderate.


== January 08 ==
== January 08 ==
Line 162: Line 165:
!  Start Time (UT) || End Time (UT) || Antenna(s) || Comments/Reasons
!  Start Time (UT) || End Time (UT) || Antenna(s) || Comments/Reasons
|-
|-
| 00:00 || 23:59 || 7 || It has no VPOL power probably due to a failed optical link
| 00:00 || 23:59 || 7 || It has no VPOL power probably due to a failed optical link.
|-
|-
| 00:00 || 23:59 || 10 || It has no VPOL power probably due to a failed optical link
| 00:00 || 23:59 || 10 || It has no VPOL power probably due to a failed optical link.
|-
|-
| 00:00 || 23:59 || 13 || On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.
| 00:00 || 23:59 || 13 || On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.
Line 170: Line 173:
|}
|}
==== Events ====
==== Events ====
Solar activity is moderate.


== January 09 ==
== January 09 ==
Line 181: Line 185:
!  Start Time (UT) || End Time (UT) || Antenna(s) || Comments/Reasons
!  Start Time (UT) || End Time (UT) || Antenna(s) || Comments/Reasons
|-
|-
| 00:00 || 23:59 || 7 || It has no VPOL power probably due to a failed optical link
| 00:00 || 23:59 || 7 || It has no VPOL power probably due to a failed optical link.
|-
|-
| 00:00 || 23:59 || 10 || It has no VPOL power probably due to a failed optical link
| 00:00 || 23:59 || 10 || It has no VPOL power probably due to a failed optical link.
|-
|-
| 00:00 || 23:59 || 13 || On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.
| 00:00 || 23:59 || 13 || On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.
Line 189: Line 193:
|}
|}
==== Events ====
==== Events ====
Solar activity is moderate.


== January 10 ==
== January 10 ==
Line 210: Line 215:
|}
|}
==== Events ====
==== Events ====
Solar activity is moderate. 2 C-class flares observed by EOVSA at 18:20 and 19:00 UT. See dynamic spectra at [http://ovsa.njit.edu/wiki/index.php/Recent_Flare_List_(2021-)#January_2024 this link].

Revision as of 22:23, 23 January 2024

January 01

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
--:-- --.-- -- Unsuccessful Reference calibration; Unknown reasons.
--:-- --.-- -- Unsuccessful Phase calibration; Unknown reasons.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

January 02

Observer on duty: Owen Giersch

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
23:46 79.1 1-9, 11-12 Reference calibration successful; written to SQL (16:00 UT).
17:20 15.5 1-9, 11-12 Phase calibration successful; written to SQL.
22:14 15.5 1-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate. 1 M-class and 1 C-class flares observed by EOVSA at 18:10 and 22:01 UT. See dynamic spectra at this link.

January 03

Observer on duty: Owen Giersch

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
23:46 80.1 1-9, 11-12 Reference calibration successful; written to SQL.
17:20 15.7 1-9, 11-12 Phase calibration successful; written to SQL.
22:14 15.5 1-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate. 1 C-class and 1 B-class flares observed by EOVSA at 17:50 and 19:45 UT. See dynamic spectra at this link.

January 04

Observer on duty: Owen Giersch

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
14:52 79.2 1-9, 11-12 Reference calibration successful; written to SQL.
17:16 15.7 1-9, 11-12 Phase calibration successful; written to SQL.
22:14 15.5 1-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

January 05

Observer on duty: Owen Giersch

Calibrations

No Calibrations due to Windscram

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

January 06

Observer on duty: Owen Giersch

Calibrations

No Calibrations due to Windscram

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate. 2 C-class flares observed by EOVSA at 16:30 and 21:57 UT. See dynamic spectra at this link.

January 07

Observer on duty: Owen Giersch

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
14:52 78.4 1-2, 4-6, 8-9, 11-12 Reference calibration successful; written to SQL.
17:14 15.6 1-2, 4-6, 8-9, 11-12 Phase calibration successful; written to SQL.
22:14 15.6 1-2, 4-6, 8-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link.
00:00 23:59 10 It has no VPOL power probably due to a failed optical link.
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

January 08

Observer on duty: Owen Giersch

Calibrations

No Calibrations due to Windscram.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link.
00:00 23:59 10 It has no VPOL power probably due to a failed optical link.
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

January 09

Observer on duty: Owen Giersch

Calibrations

No Calibrations due to Windscram.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link.
00:00 23:59 10 It has no VPOL power probably due to a failed optical link.
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

January 10

Observer on duty: Owen Giersch

Calibrations

No Calibrations due to Hydraulic fault on 27m antenna.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.
00:00 23:59 14 On Wednesday, Jan 10 at 00:00 UT, It was found that the 27m antenna had a hydraulic fluid leak and that the antenna would not move. Inspection is currently underway to determine location and cause of the leak. No calibrations until the fault is rectified.

Events

Solar activity is moderate. 2 C-class flares observed by EOVSA at 18:20 and 19:00 UT. See dynamic spectra at this link.