2017 February
Jump to navigation
Jump to search
Feb 01
11:27 UT Started another interferometric pointing run (CALPNT), which has been running since 08:16 UT without error. The wind is low, and Ant 14 is working well.
17:35 UT Ant 14 was found to have a Dec PERMIT error on the current scan started 17:27 UT. All scans prior to this are okay. I will stop this run at 19:19 UT, in order to do a SOLPNT calibration and update the 2-m pointing, then test the result with another SOLPNT observation.