Timeline For FASR
2002-3: Design Study (NSF/ATI)
•International Science Definition Workshop (May 23-25, 2002)
•Configuration studies; Software architecture
•Design options; Costing (Current estimate $30 M)
2004-5: Design and Development
•Prototype Major Elements
•Prototype Array (< 10 elements)
•Refine Hardware and Software Design
2005-8: Construction