2023 November: Difference between revisions

From EOVSA Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 598: Line 598:
|-
|-
| 00:00 || 23:00 || 7 || CRIO Problems
| 00:00 || 23:00 || 7 || CRIO Problems
!-
|-
| 00:00 || 23:59 || 10 || FEM Rabbit board not online (FEM in lab)
|-
| 00:00 || 23:59 || 13 || On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.
|-
|}
==== Events ====
Solar activity is moderate.
 
== November 26 ==
Observer on duty: Caius Selhorst
 
==== Calibrations ====
{| class="wikitable"
! Start Time (UT) || Duration (min) || Antenna(s) || Comments/Reasons
|-
| 23:38 || 79.5 || 1-2, 4-9, 11-12 || Reference calibration successful; written to SQL (14:00 UT).
|-
| 22:14 || 15.7 || 1-2, 4-9, 11-12 || Phase calibration successful;  written to SQL.
|}
 
==== Outages ====
{| class="wikitable"
!  Start Time (UT) || End Time (UT) || Antenna(s) || Comments/Reasons
|-
| 00:00 || 23:59 || 3 || Elevation drive got stuck
|-
| 07:05 || 18:45 || 7 || FEM down
|-
| 07:15 || 20:25 || 8 || FEM down
|-
| 00:00 || 23:59 || 10 || FEM Rabbit board not online (FEM in lab)
|-
| 00:00 || 23:59 || 13 || On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.
|-
|}
==== Events ====
Solar activity is moderate.
 
== November 27 ==
Observer on duty: Caius Selhorst
 
==== Calibrations ====
{| class="wikitable"
!  Start Time (UT) || Duration (min) || Antenna(s) || Comments/Reasons
|-
| 14:28 || 78.0 || 1-2, 4-6, 11-12 || Reference calibration successful; written to SQL.
|-
| 17:14 || 15.6 || 1-2, 4-6, 11-12 || Phase calibration successful;  written to SQL.
|}
 
==== Outages ====
{| class="wikitable"
!  Start Time (UT) || End Time (UT) || Antenna(s) || Comments/Reasons
|-
| 00:00 || 23:59 || 3 || Elevation drive got stuck
|-
| 00:00 || 23:59 || 7 || FEM down
|-
| 00:00 || 23:59 || 8 || FEM down
|-
| 00:00 || 23:59 || 10 || FEM Rabbit board not online (FEM in lab)
|-
| 00:00 || 23:59 || 13 || On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.
|-
|}
==== Events ====
Solar activity is moderate.
 
== November 30 ==
Observer on duty: Caius Selhorst
 
==== Calibrations ====
{| class="wikitable"
!  Start Time (UT) || Duration (min) || Antenna(s) || Comments/Reasons
|-
| 00:07 (12/01) || 79.3 || 1-9, 11-12 || Reference calibration successful; written to SQL (14:00 UT).
|-
| 22:39 || 15.7 || 1-9, 11-12 || Phase calibration successful;  written to SQL.
|}
 
==== Outages ====
{| class="wikitable"
!  Start Time (UT) || End Time (UT) || Antenna(s) || Comments/Reasons
|-
| 00:00 || 23:59 || 10 || FEM Rabbit board not online (FEM in lab)
| 00:00 || 23:59 || 10 || FEM Rabbit board not online (FEM in lab)
|-
|-

Latest revision as of 17:36, 1 December 2023

November 1

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
11:00 79.2 1-5, 7-8, 11, 13 Reference calibration successful; written to SQL.
17:14 15.5 1-5, 7-8, 11, 13 Phase calibration successful; written to SQL

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 6 Optical link issue (FEM in lab)
00:00 23:59 9 Will not STOW (HA motor problem)
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 12 Elevation drive replaced

Events

Solar activity is moderate.

November 2

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
13:57 78.2 1-5, 7-9, 11, 13 Reference calibration successful; written to SQL.
17:14 15.5 1-5, 7-9, 11, 13 Phase calibration successful; written to SQL

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 6 Optical link issue (FEM in lab)
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 12 Elevation drive replaced

Events

Solar activity is moderate. 1 M-class flare observed by EOVSA at 19:16 UT. See dynamic spectra at this link.

November 3

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
00:25 (11/03) 79.1 1-5, 7-9, 11, 13 Reference calibration successful; written to SQL (14:00UT).
--:-- --.-- -- Unsuccessful Phase calibration; Unknown reasons.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 6 Optical link issue (FEM in lab)
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 12 Elevation drive replaced

Events

Solar activity is moderate.

November 4

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
14:00 78.3 1-5, 7-9, 11, 13 Reference calibration successful; written to SQL.
17:14 15.7 1-5, 7-9, 11, 13 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 6 Optical link issue (FEM in lab)
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 12 Elevation drive replaced

Events

Solar activity is moderate.Unknown reasons.

November 5

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
14:01 78.3 1-5, 7-9, 11, 13 Reference calibration successful; written to SQL.
17:14 15.7 1-5, 7-9, 11, 13 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 6 Optical link issue (FEM in lab)
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 12 Elevation drive replaced

Events

Solar activity is moderate. 1 C-class flare observed by EOVSA at 19:16 UT. See dynamic spectra at this link.

November 6

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
14:02 78.3 1-5, 7-9, 11, 13 Reference calibration successful; written to SQL.
17:14 15.7 1-5, 7-9, 11, 13 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 6 Optical link issue (FEM in lab)
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 12 Elevation drive replaced

Events

Solar activity is moderate.

November 7

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
14:03 78.2 1-9, 11, 13 Reference calibration successful; written to SQL.
--:-- --.-- -- Unsuccessful Phase calibration ; Unknown reasons.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 12 Elevation drive replaced

Events

Solar activity is moderate.

November 8

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
14:04 78.2 1-9, 11, 13 Reference calibration successful; written to SQL.
22:48 15.6 1-9, 11 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 12 Elevation drive replaced

Events

Solar activity is moderate.

November 9

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
00:01 (11/10) 79.3 1-9, 11-13 Reference calibration successful; written to SQL (14:00 UT).
22:44 15.6 1-9, 11-13 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 18:00 7 FEM network communication problems
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)

Events

Solar activity is moderate.

November 10

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
23:57 79.4 1-9, 11-13 Reference calibration successful; written to SQL (14:00 UT).
22:40 15.7 1-9, 11-13 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 18:00 7 FEM network communication problems
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)

Events

Solar activity is moderate.

November 11

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
14:08 78.1 1-6, 8-9, 11-13 Reference calibration successful; written to SQL.
17:14 15.7 1-6, 8-9, 11-13 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 18:00 7 FEM network communication problems
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)

Events

Solar activity is moderate. 2 C-class flares observed by EOVSA at 16:45 UT and 18:05 UT. See dynamic spectra at this link.

November 12

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
14:08 78.2 1-6, 8-9, 12 Reference calibration successful; written to SQL.
17:14 15.6 1-6, 8-9, 12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 13

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
--:-- --.- -- Unsuccessful Reference calibration; 27m Feed offset at 90 degrees.
--:-- --.- -- Unsuccessful Phase calibration; 27m Feed offset at 90 degrees.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 14

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
23:47 79.3 1-9, 11-12 Reference calibration successful; written to SQL (14:00 UT).
22:24 15.7 1-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate. 1 M-class flare observed by EOVSA at 23:04 UT. See dynamic spectra at this link.

November 15

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
14:13 78.3 1-9, 12 Reference calibration successful; written to SQL.
17:14 15.7 1-9, 12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 16

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
14:14 78.2 1-9, 11-12 Reference calibration successful; written to SQL.
22:17 15.7 1-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 17

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
14:16 78.2 1-9, 11-12 Reference calibration successful; written to SQL.
17:14 15.7 1-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 18

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
23:43 79.1 1-9, 11-12 Reference calibration successful; written to SQL (14:00 UT).
17:14 15.7 1-3, 5-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 19

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
--:-- --.-- -- Unsuccessful Reference calibration ; High wind in the morning and Helios problems in the afternoon.
--:-- --.-- -- Unsuccessful Phase calibration.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 20

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
00:03 (11/21) 59.5 1-9, 11-12 Reference calibration successful(only the 30min good); written to SQL (14:00 UT).
--:-- --.-- -- Unsuccessful Phase calibration. Unknown reasons.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 21

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
00:02 (11/22) 79.2 1-9, 11-12 Reference calibration successful; written to SQL (14:00 UT).
22:14 15.7 1-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 22

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
23:40 79.2 1-9, 11-12 Reference calibration successful; written to SQL (14:00 UT).
22:14 15.6 1-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 23

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
14:23 78.3 1-9, 11-12 Reference calibration successful; written to SQL.
17:14 15.7 1-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 24

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
23:39 79.1 1-9, 11-12 Reference calibration successful; written to SQL (14:00 UT).
22:14 15.6 1-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 25

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
23:38 79.1 1-9, 11-12 Reference calibration successful; written to SQL (14:00 UT).
22:14 15.6 1-6, 8-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:00 7 CRIO Problems
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 26

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
23:38 79.5 1-2, 4-9, 11-12 Reference calibration successful; written to SQL (14:00 UT).
22:14 15.7 1-2, 4-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 3 Elevation drive got stuck
07:05 18:45 7 FEM down
07:15 20:25 8 FEM down
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 27

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
14:28 78.0 1-2, 4-6, 11-12 Reference calibration successful; written to SQL.
17:14 15.6 1-2, 4-6, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 3 Elevation drive got stuck
00:00 23:59 7 FEM down
00:00 23:59 8 FEM down
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.

November 30

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
00:07 (12/01) 79.3 1-9, 11-12 Reference calibration successful; written to SQL (14:00 UT).
22:39 15.7 1-9, 11-12 Phase calibration successful; written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 10 FEM Rabbit board not online (FEM in lab)
00:00 23:59 13 On Saturday, Nov 11 at 23:50 UT, The Ant13 shed was broken into and the cable from the solar cell batteries to the inverter was cut. Ant13 will remain off line until a replacement cable can be purchased.

Events

Solar activity is moderate.