2024 May: Difference between revisions

From EOVSA Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 62: Line 62:
!  Start Time (UT) || Duration (min) || Antenna(s) || Comments/Reasons
!  Start Time (UT) || Duration (min) || Antenna(s) || Comments/Reasons
|-
|-
| 12:32 || 79 || 1-9, 11-13 || Successful Reference calibration. Ant7 (Bands<25). Analysis written to SQL @2024-05-02 12:57.
| 12:32 || 79 || 1-9, 11-13 || Successful Reference calibration. Ant7 (Bands<25). Analysis written to SQL @2024-05-03 12:57.
|-
|-
| 15:14 || 16 || 1-6, 8-9, 11-13  || Successful Phase calibration. Analysis written to SQL.
| 15:14 || 16 || 1-6, 8-9, 11-13  || Successful Phase calibration. Analysis written to SQL.
Line 84: Line 84:
==== Events ====
==== Events ====
Solar activity is moderate. 1 M-class and 2 C-class flares observed by EOVSA at 00:14, 16:10 and 18:52 UT. See dynamic spectra at [http://ovsa.njit.edu/wiki/index.php/2024#May this link].
Solar activity is moderate. 1 M-class and 2 C-class flares observed by EOVSA at 00:14, 16:10 and 18:52 UT. See dynamic spectra at [http://ovsa.njit.edu/wiki/index.php/2024#May this link].
== May 04 ==
Observer on duty: Caius Selhorst
==== Calibrations ====
{| class="wikitable"
!  Start Time (UT) || Duration (min) || Antenna(s) || Comments/Reasons
|-
| 12:31 || 79 || 1-9, 11-13 || Successful Reference calibration. Ant7 (Bands<14). Analysis written to SQL @2024-05-04 12:56.
|-
| 15:14 || 16 || 1-6, 8-9, 11-13  || Successful Phase calibration. Analysis written to SQL.
|-
|}
==== Outages ====
{| class="wikitable"
!  Start Time (UT) || End Time (UT) || Antenna(s) || Comments/Reasons
|-
| 00:00 || 23:59 || 7 || It has no VPOL power probably due to a failed optical link
|-
| 00:00 || 23:59 || 10 || It has no VPOL power probably due to a failed optical link
|-
|}
==== Events ====
Solar activity is moderate.

Revision as of 17:47, 6 May 2024

May 01

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
-- -- -- Unsuccessful Reference calibration. Installing the new ACC.
-- -- -- Unsuccessful Phase calibration. Installing the new ACC.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link

Events

Solar activity is moderate.

May 02

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:33 79 1-9, 11-13 Successful Reference calibration. Ant7 (Bands<13). Analysis written to SQL @2024-05-02 12:58.
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link

Events

Solar activity is moderate. 1 M-class and 3 C-class flares observed by EOVSA at 17:00, 18:14, 18:57 and 20:55 UT. See dynamic spectra at this link.

May 03

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:32 79 1-9, 11-13 Successful Reference calibration. Ant7 (Bands<25). Analysis written to SQL @2024-05-03 12:57.
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:53 16 1-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link

Events

Solar activity is moderate. 1 M-class and 2 C-class flares observed by EOVSA at 00:14, 16:10 and 18:52 UT. See dynamic spectra at this link.

May 04

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:31 79 1-9, 11-13 Successful Reference calibration. Ant7 (Bands<14). Analysis written to SQL @2024-05-04 12:56.
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link

Events

Solar activity is moderate.