June 01

Observer on duty: Owen Giersch

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:45 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 32. Analysis written to SQL @2024-06-01 12:49.
15:14 59 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
00:04 (Jun 02) 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate. 1 X-class, 2 M-class and 2 C-class flares observed by EOVSA at 00:56, 17:24, 18:40, 19:25 and 21:03 UT. See dynamic spectra at this link.

June 02

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
02:13 (Jun 03) 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 40. Analysis written to SQL @2024-06-02 11:00.
15:14 59 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
00:00 (Jun 03) 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate. 6 C-class flares observed by EOVSA at 01:47, 14:34, 17:53, 22:00, 22:31 and 23:11 UT. See dynamic spectra at this link.


June 03

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:23 78 1-6, 8-9, 11-13 Successful Reference calibration for bands < 33. Analysis written to SQL @2024-06-02 12:48.
15:14 59 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:56 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate. 1 M-class and 2 C-class flares observed by EOVSA at 00:30, 14:13 and 22:07 UT. See dynamic spectra at this link.


June 04

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
-- -- -- Unsuccessful Reference calibration. Due to high winds.
-- -- -- Unsuccessful Phase calibration. Due to high winds.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:56 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate.

June 05

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:23 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 33. Analysis written to SQL @2024-06-05 12:48
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:47 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate.

June 06

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
02:15 (Jun 07) 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 33. Analysis written to SQL @2024-06-06 11:00
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:47 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate. 1 M-class and 2 C-class flares observed by EOVSA at 14:17, 15:00 and 20:39 UT. See dynamic spectra at this link.

June 07

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:23 78 1-6, 8-9, 11-13 Successful Reference calibration for bands < 31. Analysis written to SQL @2024-06-07 12:48
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:47 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate. 1 M-class and 2 C-class flares observed by EOVSA at 00:32, 16:18 and 22:41 UT. See dynamic spectra at this link.

June 08

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:23 78 1-6, 8-9, 11-13 Successful Reference calibration for bands < 33. Analysis written to SQL @2024-06-08 12:48
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate. 4 M-class and 2 C-class flares observed by EOVSA at 00:26, 00:50, 01:33, 17:38, 18:07 and 21:01 UT. See dynamic spectra at this link.


June 09

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
02:16 (Jun 10) 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 32. Analysis written to SQL @2024-06-09 11:00
15:14 16 2-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate.

June 10

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
02:17 (Jun 11) 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 32. Analysis written to SQL @2024-06-10 11:00
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:29 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate. 1 M-class flare observed by EOVSA at 18:27 UT. See dynamic spectra at this link.

June 11

Observer on duty: Owen Giersch

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:22 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 32. Analysis written to SQL @2024-06-11 12:47
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:25 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate. 1 C-class flare observed by EOVSA at 22:36 UT. See dynamic spectra at this link.

June 12

Observer on duty: Owen Giersch

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:22 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 35. Analysis written to SQL @2024-06-12 12:26
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate. 2 C-class flares observed by EOVSA at 19:06 and 20:50 UT. See dynamic spectra at this link.

June 13

Observer on duty: Owen Giersch

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
02:18 (Jun 14) 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 40. Analysis written to SQL @2024-06-13 11:00
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate. 1 M-class and 2 C-class flares observed by EOVSA at 16:38 and 18:52 UT. See dynamic spectra at this link.

June 14

Observer on duty: Owen Giersch

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
02:14 (Jun 15) 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 40. Analysis written to SQL @2024-06-14 11:00
12:44 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate. 2 C-class flares observed by EOVSA at 16:13 and 22:09 UT. See dynamic spectra at this link.

June 15

Observer on duty: Owen Giersch

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
02:19 (Jun 16) 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 40. Analysis written to SQL @2024-06-15 11:00
12:44 59 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate. 7 C-class flares observed by EOVSA at 16:32, 17:00, 17:50, 18:58, 19:10, 21:10 and 21:29 UT. See dynamic spectra at this link.

June 16

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
-- -- -- Unsuccessful Reference calibration. Problems with the 27 m.
-- -- -- Unsuccessful Phase calibration. Problems with the 27 m.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate.

June 17

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
-- -- -- Unsuccessful Reference calibration. Problems with the 27 m and high winds.
-- -- -- Unsuccessful Phase calibration. Problems with the 27 m.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate.

June 18

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
02:20 (Jun 19) 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 35. Analysis written to SQL @2024-06-18 11:00
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate.


June 19

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
02:20 (Jun 20) 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 39. Analysis written to SQL @2024-06-19 11:00
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate.

June 20

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
02:20 (Jun 21) 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 39. Analysis written to SQL @2024-06-20 11:00
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate.

June 21

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
02:20 (Jun 22) 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 37. Analysis written to SQL @2024-06-21 11:00
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

June 22

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
02:42 (Jun 23) 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 30. Analysis written to SQL @2024-06-22 11:00

No Good Phasecals

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate.

June 23

Observer on duty: Owen Giersch

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:45 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 40. Analysis written to SQL @2024-06-23 12:49
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate.

June 24

Observer on duty: Owen Giersch

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:24 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 30. Analysis written to SQL @2024-06-24 12:49
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate.

June 25

Observer on duty: Caius Selhorst

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:25 79 1-6, 8-9, 11-13 Successful Reference calibration for bands < 40. Analysis written to SQL @2024-06-24 12:50
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
02:42 (Jun 26) 59 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link. FEM is in the Lab.

Events

Solar activity is moderate.