2024 May

From EOVSA Wiki
Jump to navigation Jump to search

May 01

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
-- -- -- Unsuccessful Reference calibration. Installing the new ACC.
-- -- -- Unsuccessful Phase calibration. Installing the new ACC.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link

Events

Solar activity is moderate.

May 02

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:33 79 1-9, 11-13 Successful Reference calibration. Ant7 (Bands<13). Analysis written to SQL @2024-05-02 12:58.
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link

Events

Solar activity is moderate. 1 M-class and 3 C-class flares observed by EOVSA at 17:00, 18:14, 18:57 and 20:55 UT. See dynamic spectra at this link.

May 03

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:32 79 1-9, 11-13 Successful Reference calibration. Ant7 (Bands<25). Analysis written to SQL @2024-05-03 12:57.
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:53 16 1-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link

Events

Solar activity is moderate. 2 M-class and 2 C-class flares observed by EOVSA at 00:14, 16:10, 18:52 and 23:37 UT. See dynamic spectra at this link.

May 04

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:31 79 1-9, 11-13 Successful Reference calibration. Ant7 (Bands<14). Analysis written to SQL @2024-05-04 12:56.
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link

Events

Solar activity is moderate. 4 M-class and 6 C-class flares observed by EOVSA at 00:32, 16:00, 17:15, 17:48, 18:18, 19:17, 20:38, 21:49, 23:05 and 23:47 UT. See dynamic spectra at this link.

May 05

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
-- -- -- Unsuccessful Reference calibration. Due to high winds.
-- -- -- Unsuccessful Phase calibration. Due to high winds.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link

Events

Solar activity is moderate. 4 M-class and 6 C-class flares observed by EOVSA at 00:07, 00:39, 01:06, 01:23, 14:14, 16:36, 17:43, 18:03, 20:19 and 22:28 UT. See dynamic spectra at this link.

May 06

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
01:54 (May-07) 80 1-9, 11-13 Successful Reference calibration. Ant7 (Bands<16). Analysis written to SQL @2024-05-06 14:00.
19:41 16 1-9, 11-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link

Events

Solar activity is moderate.

May 07

Observer on duty: Caius Selhorst

Calibrations

Start Time (UT) Duration (min) Antenna(s) Comments/Reasons
12:28 79 1-9, 11-13 Successful Reference calibration. Ant7 (Bands<18). Analysis written to SQL @2024-05-07 12:53.
15:14 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.
19:37 16 1-6, 8-9, 11-13 Successful Phase calibration. Analysis written to SQL.

Outages

Start Time (UT) End Time (UT) Antenna(s) Comments/Reasons
00:00 23:59 7 It has no VPOL power probably due to a failed optical link
00:00 23:59 10 It has no VPOL power probably due to a failed optical link

Events

Solar activity is moderate.