Skip to content

2025 June

Daily observation notes published from the eovsadata canonical log.

June 01

Observer: Caius Selhorst

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
5 Ant 5 has low VPOL power probably due to DCM issue
The 27-m focus mechanism is not moving. Rebooting the Brick did not / fix the problem--must be a hardware failure. The schedule has been put / to mode "No 27-m" / The schedule did not start this morning (REWIND command is missing). Started / at 14:45UT
13 Ant13 shutdown from 15:00UT to 17:25UT to work on cabling.

Observations

May 12 - June 05

No calibration during the period, due to the installation of the new antennas.

Antenna availability: automatic assessment.

June 02

Observer: Caius Selhorst

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
5 Ant 5 has low VPOL power probably due to DCM issue
The 27-m focus mechanism is not moving. Mark and Charlie are looking at it / this morning. We are on "No 27m" mode for now. (The mechanism moves with / the hand controller but still have Amp Fault, so suggests a problem w/ brick).

Observations

May 12 - June 05

No calibration during the period, due to the installation of the new antennas.

Antenna availability: automatic assessment.

June 03

Observer: Caius Selhorst

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
5 Ant 5 has low VPOL power probably due to DCM issue
The 27-m focus mechanism is not moving. Mark and Charlie are looking at it / this morning. We are on "No 27m" mode for now. (The mechanism moves with / the hand controller but still have Amp Fault, so suggests a problem w/ brick).
Observation started @15:10 UT
13 Ant13 reboot at 22:00 UT

Observations

May 12 - June 05

No calibration during the period, due to the installation of the new antennas.

Antenna availability: automatic assessment.

June 04

Observer: Caius Selhorst

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
5 Ant 5 has low VPOL power probably due to DCM issue
The 27-m focus mechanism is not moving. Mark and Charlie are looking at it / this morning. We are on "No 27m" mode for now. (The mechanism moves with / the hand controller but still have Amp Fault, so suggests a problem w/ brick).
Observation started @15:20 UT
12 Ant12 reboot @16:00 UT
12 and 13 Ant12 and 13 were shutdown @19:45 UT

Observations

May 12 - June 05

No calibration during the period, due to the installation of the new antennas.

Antenna availability: automatic assessment.

June 05

Observer: Caius Selhorst

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
5 Ant 5 has low VPOL power probably due to DCM issue
The 27-m focus mechanism is not moving. Mark and Charlie found the problem / (bad cable), so should get it working soon. We are on "No 27m" mode for now. / --Went back to full observing schedule at 23:20 UT, in time for one phasecal, / and hopefully a full refcal tonight. Tomorrow we'll try to tune the system.
Observation started @15:10 UT. Ants 12 and 13 were down due to REASON test / (solar power stations turned off). They came back about 16:00 UT.

Observations

May 12 - June 05

No calibration during the period, due to the installation of the new antennas.

Antenna availability: automatic assessment.

June 06

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
02:15 (Jun 07) 79 1, 4-8 Successful Reference calibration for bands < 40. Analysis written to SQL @2025-06-06 14:00 UT.
23:45 16 1, 4-8 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
5 Ant 5 has low VPOL power probably due to DCM issue
The 27-m is working again, so I'll do some delay measurements today. The / calibrations are no good as they are...
12 and 13 Ant12 and 13 shutdown for LWA measurements at 2010UT
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM problem.

Antenna availability: automatic assessment.

June 07

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
02:36 (Jun 08) 60 1, 4-8, 12-13 Successful Reference calibration for bands \> 7 and < 34. Analysis written to SQL @2025-06-07 13:00 UT.
19:54 16 1, 4-8, 12-13 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
5 Ant 5 has low VPOL power probably due to DCM issue
12 and 13 Ants 12 and 13 are still down this morning. Caius should restart them soon. / Okay, started around 15:50 UT.
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM problem.

Antenna availability: automatic assessment.

June 08

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:23 79 1, 4-8, 11-13 Successful Reference calibration for bands < 33. Analysis written to SQL @2025-06-08 12:48 UT.
23:38 16 1, 4-8, 12-13 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
5 Ant 5 has low VPOL power probably due to DCM issue
9 Ant 9 FEM is in the lab.
Normal start this morning.
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM problem.

Antenna availability: automatic assessment.

June 09

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
02:16 (Jun 10) 79 1, 4-8 Successful Reference calibration for bands < 34. Analysis written to SQL @2025-06-09 13:00 UT.
19:54 16 1, 4-8 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
5 Ant 5 has low VPOL power probably due to DCM issue
9 Ant 9 FEM is in the lab.
1 Ant 1 had a permit alarm and did not start this morning. It is tracking again / around 16:05 UT.
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.
00:00–23:59 11 Ant11 FEM in the lab due to bad optical conector.
20:00–23:59 12 Ant12 off due to LWA special observation.
20:00–23:59 13 Ant13 off due to LWA special observation.

Antenna availability: automatic assessment.

June 10

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
02:17 (Jun 11) 79 1, 4-8, 12-13 Successful Reference calibration for bands < 34. Analysis written to SQL @2025-06-10 13:00 UT.
19:54 16 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
11 Ant 11 FEM is in the lab due to bad optical connector.
Ants 12 and 13 solar power are still off due to the REASON test yesterday. / They will be turned back on shortly. Ants 2, 3, 9-11 are all down.
Ant 12 on Sun at 16:08 UT. Ant 13 on Sun at 16:17 UT. / Gelu was working on the codes after 22:00 UT
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.
00:00–23:59 11 Ant11 FEM in the lab due to bad optical conector.
00:00–16:00 12 Ant12 off due to LWA special observation.
00:00–16:00 13 Ant13 off due to LWA special observation.

Antenna availability: automatic assessment.

June 11

Observer: Caius Selhorst

Calibrations

Start (UT) Duration (min) Antennas Details
12:22 79 1, 4-8, 12-13 Successful Reference calibration for bands < 40. Analysis written to SQL @2025-06-11 12:47 UT.
19:54 16 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
11 Ant 11 FEM is in the lab due to bad optical connector.
Normal start this morning.
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.
00:00–23:59 11 Ant11 FEM in the lab due to bad optical conector.

Antenna availability: automatic assessment.

June 13

Observer: Owen Giersch

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
02:39 Jun 14 79 1, 4-8, 12-13 Successful Reference calibration for bands < 34. Analysis written to SQL @2025-06-13 11:00 UT.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
11 Ant 11 FEM is in the lab due to bad optical connector.
Normal start this morning. / ACC locked up at 15:30UT. Restarted at 15:50UT. / Power cycled the ACC at 16:05UT. Restarted at 16:19UT
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 14

Observer: Owen Giersch

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:22 79 1, 4-8, 12 Successful Reference calibration for bands < 42. Analysis written to SQL @2025-06-14 12:47 UT.
02:39 (Jun 15) 60 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
Normal start this morning. / Pointing on all antennas was updated at 13:55 UT.
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 15

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:44 59 1, 4-8, 11-13 Successful Reference calibration for bands \> 7 and < 42. Analysis written to SQL @2025-06-15 12:48 UT.
19:54 16 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.
02:40 (Jun 17) 60 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
Normal start this morning.
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 16

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:23 79 1, 4-8, 11-13 Successful Reference calibration for bands < 42. Analysis written to SQL @2025-06-16 12:48 UT.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
Normal start this morning. Several interruptions for SOLPNTCALs today.
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 17

Observer: Owen Giersch

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:23 79 1, 4-8, 11-12 Successful Reference calibration for bands < 42. Analysis written to SQL @2025-06-17 12:48 UT.
19:54 16 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.
23:14 16 1, 4-8, 11-12 Successful Phase calibration. Analysis written to SQL.
02:40 (Jun 18) 60 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
Normal start this morning.
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 18

Observer: Owen Giersch

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:23 79 1, 4-8, 11-13 Successful Reference calibration for bands < 42. Analysis written to SQL @2025-06-18 12:48 UT.
19:54 16 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.
02:41 60 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 19

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:23 79 1, 4-8, 11-13 Successful Reference calibration for bands < 42. Analysis written to SQL @2025-06-19 12:48 UT.
19:54 16 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 20

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:23 79 1, 4-8, 11-13 Successful Reference calibration for bands < 42. Analysis written to SQL @2025-06-20 12:48 UT.
19:54 16 1, 4-6, 8, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
Normal start this morning.
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 21

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:24 79 1, 4-8, 11-13 Successful Reference calibration for bands < 42. Analysis written to SQL @2025-06-21 12:49 UT.
19:54 16 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
Normal start this morning.
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 22

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
02:21 (Jun 23) 79 1, 4-8, 11-13 Successful Reference calibration for bands < 40. Analysis written to SQL @2025-06-22 13:00 UT.
19:54 16 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
1 Ant1 got stuck in the morning. It's rebooted @15:45 UT
6 Ant6 rebooted @15:56 UT
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 23

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:24 79 1, 4-8, 11-13 Successful Reference calibration for bands < 40. Analysis written to SQL @2025-06-23 12:49 UT.
19:54 16 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
Normal start this morning.
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 24

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:24 79 1, 4-8, 11-13 Successful Reference calibration for bands < 42. Analysis written to SQL @2025-06-24 12:49 UT.
19:54 16 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.
02:42 (Jun 25) 60 1, 4-8, 12-13 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
Normal start this morning.
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 25

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
02:21 (Jun 26) 79 1, 4-8, 11-13 Successful Reference calibration for bands < 30. Analysis written to SQL @2025-06-25 13:00 UT.
12:46 59 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.
19:54 16 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
Normal start this morning. / ADC_plot restarted at 22:40 UT
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 26

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:25 79 1, 4-8, 11-13 Successful Reference calibration for bands < 42. Analysis written to SQL @2025-06-26 12:50 UT.
02:42 (Jun 27) 60 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
Normal start this morning.
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 27

Observer: Owen Giersch

Calibrations

Start (UT) Duration (min) Antennas Details
02:21 (June 28) 79 1, 4-8, 11-13 Successful Reference calibration for bands < 31. Analysis written to SQL @2025-06-27 11:00 UT.
12:42 60 1, 4-8, 13 Successful Phase calibration. Analysis written to SQL.
15:14 16 1, 4, 6-8 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
12 Ant12 didn't start this morning due to Solar Power failure. / The Solar Power was restarted at 16:00 UT
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 28

Observer: Owen Giersch

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:26 79 1, 4-8, 11-13 Successful Reference calibration for bands < 43. Analysis written to SQL @2025-06-28 12:51 UT.
15:14 16 1, 4-7, 12 Successful Phase calibration. Analysis written to SQL.
02:42 (Jun 29) 60 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
Normal Startup
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 29

Observer: Owen Giersch

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:26 79 1, 4-8, 11-13 Successful Reference calibration for bands < 41. Analysis written to SQL @2025-06-29 12:51 UT.
19:54 16 1, 4-8, 12 Successful Phase calibration. Analysis written to SQL.
02:42 (Jun 30) 60 1, 4-8, 11-13 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
9 Ant 9 FEM is in the lab--rabbit board replaced but needs IP addres.
10 Ant 10 optical power is low--not good data
Normal Startup
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.

June 30

Observer: Owen Giersch

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
12:26 79 1, 4-8, 11-13 Successful Reference calibration for bands < 41. Analysis written to SQL @2025-06-30 12:51 UT.
02:42 (Jul 1) 60 1, 4-8, 11-13 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 Drive is stuck. Reseated all of the drive control cables and this / cleared error on the controller LCD, but it is still not responding / to remote commands. Azimuth keeps reporting axis lock.
3 Ant 3 drive is fixed, but FEM is not installed.
10 Ant 10 optical power is low--not good data
Normal Startup
9 Ant 9 was finally repaired and put onto the Sun at 23:01 UT.
00:00–23:59 2 Ant2 drive is stuck.
00:00–23:59 3 Ant3 FEM problem.
00:00–23:59 9 Ant9 FEM in the lab due to rabbit board problem.

Antenna availability: automatic assessment.