Skip to content

2026 April

Daily observation notes published from the eovsadata canonical log.

April 01

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
10:00 79 1, 3-13 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-01 10:25 UT.
15:14 16 1, 3-8, 10, 12-13 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant 2 still out with Dec controller problem.; Ant2 drive is stuck.
Normal startup this morning.
The new antenna mounts were showing offsets (stuck RA) / RA 00:43:50 (Old) and 00:41:39 (New) at 15:30UT. / Skipped the PHASECAL at 19:59UT

Antenna availability: automatic assessment.

April 02

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
9:56 79 1, 3-13 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-02 10:21 UT.
15:14 16 1, 3-8, 10-12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant 2 still out with Dec controller problem.; Ant2 drive is stuck.
Normal startup this morning.
The new antenna mounts were showing offsets (stuck RA) / RA 00:47:30 (Old) and 00:45:18 (New) at 15:30UT.
13 Ant13 got stuck at 15:30 UT. $pcycle at 15:50 UT

Antenna availability: automatic assessment.

April 03

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
3:58 (Apr 4) 79 1, 3-13 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-03 13:00 UT.
15:14 16 1, 3-6, 8, 10-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1, 3-6, 8, 10-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1, 3-13 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant 2 still out with Dec controller problem.; Ant2 drive is stuck.
Windscram during the morning calibration.
Spectrograms are missing some specfic bands.

Antenna availability: automatic assessment.

April 04

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
9:48 79 1, 3-13 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-04 10:13 UT.
15:14 16 1, 3-6, 8, 10-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1, 3-6, 8, 10-13 Successful Phase calibration. Analysis written to SQL.
04:15 (Apr 5) 60 1, 3-8, 10-13 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant2 drive is stuck.

Antenna availability: automatic assessment.

April 05

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
9:44 79 1, 3-13 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-05 10:09 UT.
15:14 16 1, 3-6, 8, 10-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1, 3-8, 10-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1, 3-13 Successful Phase calibration. Analysis written to SQL.
04:11 (Apr 6) 60 1, 3-12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant2 drive is stuck.

Antenna availability: automatic assessment.

April 06

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
9:40 79 1, 3-12 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-06 10:05 UT.
15:14 16 1, 4-8, 10-12 Successful Phase calibration. Analysis written to SQL.
19:54 16 1, 3-12 Successful Phase calibration. Analysis written to SQL.
23:14 16 1, 3-12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant 2 still out with Dec controller problem.; Ant2 drive is stuck.
Ant3 and Ant9 got stuck in the mornind. / $pcycle at 15:45UT

Antenna availability: automatic assessment.

April 07

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
9:36 79 1, 3-13 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-07 10:01 UT.
15:14 16 1, 3-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1, 3-13 Successful Phase calibration. Analysis written to SQL.
23:14 16 1, 3-8, 10, 12 Successful Phase calibration. Analysis written to SQL.
4:03 (Apr 8) 60 1, 3-8, 10, 12 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant 2 still out with Dec controller problem.; Ant2 drive is stuck.

Observations

Normal startup today.

Antenna availability: automatic assessment.

April 08

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
3:38 (Apr 9) 79 1, 3-13 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-08 13:00 UT.
9:53 60 1, 3-8, 10, 12 Successful Phase calibration. Analysis written to SQL.
15:14 16 1, 3-8, 10, 12 Successful Phase calibration. Analysis written to SQL.
19:54 16 1, 3-13 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant 2 still out with Dec controller problem.; Ant2 drive is stuck.
One of the DCMs power supplies fail due to a bad fuse. / The fuse was replaced around 18:45 UT. / The problem affected Ant9, 11 and 13.

Antenna availability: automatic assessment.

April 09

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
9:29 79 1, 3-13 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-09 9:54 UT.
15:14 16 1, 3-10, 12-13 Successful Phase calibration. Analysis written to SQL.
19:54 16 1, 3-13 Successful Phase calibration. Analysis written to SQL.
3:56 (Apr 10) 60 1, 3-13 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant 2 still out with Dec controller problem.; Ant2 drive is stuck.
11 Ant11 got stuck in the morning. / $pcycle at 15:50UT

Antenna availability: automatic assessment.

April 10

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
9:25 79 1, 3-13 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-10 9:50 UT.
15:14 16 1, 3-10, 12-13 Successful Phase calibration. Analysis written to SQL.
3:52 (Apr 11) 60 1, 3-8, 10-13 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant 2 still out with Dec controller problem.; Ant2 drive is stuck.
Normal startup today

Antenna availability: automatic assessment.

April 11

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
9:21 79 1, 3-13 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-11 9:46 UT.
3:48 (Apr 12) 60 1, 3-13 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant2 drive is stuck.

Antenna availability: automatic assessment.

April 12

Observer: Caius Selhorst

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
3:23 (Apr 13) 79 1, 3-13 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-12 13:00 UT.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant2 drive is stuck.

Antenna availability: automatic assessment.

April 13

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
3:23 (Apr 14) 79 1, 3-5, 7-8, 10-11 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-13 13:00 UT.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant 2 still out with Dec controller problem.; Ant2 drive is stuck.
13 Ant 13 wasn't tracking in the morning. $pcycle @15:30UT / Manlight and ROACH5 stopped working again.
After restarting the ROACHs, we started new PHASECALs to set the delays

Observations

ROACH5 and Manlight were restarted. New delays were set for most of the antennas, except 6, 9, 12-13.

Antenna availability: automatic assessment.

April 14

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
9:09 79 1, 3-5, 7-8, 10-11 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-14 9:34 UT.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant 2 still out with Dec controller problem.; Ant2 drive is stuck.
6, 9, 12-13 Ant6, 9, 12-13 need delay corrections.

Observations

Normal startup today.

Antenna availability: automatic assessment.

April 15

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Solar activity: Solar activity is low.

Calibrations

Start (UT) Duration (min) Antennas Details
9:05 79 1, 3-5, 7-8, 10-11 Successful Reference calibration for bands < 30. Analysis written to SQL @2026-04-15 9:30 UT.
12:28 60 1, 3-5, 7-8 Successful Phase calibration. Analysis written to SQL.

Issues and outages

Time (UT) Antennas Details
00:00–23:59 2 Ant 2 still out with Dec controller problem.; Ant2 drive is stuck.
The 27m has a leak in the cryogenic pump that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work.
6, 9, 12-13 Ant6, 9, 12-13 need delay corrections.

Observations

Normal startup today.

Antenna availability: automatic assessment.

April 16

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 still out with Dec controller problem.
On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work.
6, 9, 12-13 Ant6, 9, 12-13 need delay corrections.

Observations

Normal startup today.

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.

April 17

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 still out with Dec controller problem.
On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work.
9, 12-13 Ant9, 12-13 need delay corrections.

Observations

Normal startup today.

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.

April 18

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 still out with Dec controller problem.
On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work.
9, 12-13 Ant9, 12-13 need delay corrections.

Observations

Normal startup today.

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.

April 19

Observer: Caius Selhorst

Observations

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.

April 20

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 still out with Dec controller problem.
On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work.
9, 12-13 Ant9, 12-13 need delay corrections.

Observations

Normal startup today.

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.

April 21

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 still out with Dec controller problem.
Normal startup today. / The power supplies on Ant9, 11 and 13 were set to 12.40V at both sides
On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work.
9, 12-13 Ant9, 12-13 need delay corrections.

Observations

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.

April 22

Observer: Caius Selhorst

Observations

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.

April 23

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 still out with Dec controller problem.
On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work.
9, 12-13 Ant9, 12-13 need delay corrections.

Observations

Normal startup today.

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.

April 24

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 still out with Dec controller problem.
On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work.
9, 12-13 Ant9, 12-13 need delay corrections.

Observations

Normal startup today.

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.

April 25

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 still out with Dec controller problem.
3 and 12 Ant3 and 12 got stuck in the morning.
12 Ant12 $pcycle at 15:12UT
3 Ant3 fixed on Win1 antenna controler at 15:16UT
15 Ant15 started tracking at 15:21UT
On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work.
9, 12-13 Ant9, 12-13 need delay corrections.

Observations

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.

April 26

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 still out with Dec controller problem.
On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work.
9, 12-13 Ant9, 12-13 need delay corrections.

Observations

Normal startup today.

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.

April 27

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 still out with Dec controller problem.
3 Ant3 got stuck in the morning. / $pcycle at 15:34 UT
On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work.
9, 12-13 Ant9, 12-13 need delay corrections.

Observations

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.

April 28

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 still out with Dec controller problem.
3 Ant3 got stuck in the morning. / $pcycle at 15:19 UT
On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work.
9, 12-13 Ant9, 12-13 need delay corrections.

Observations

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.

April 29

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 still out with Dec controller problem.
3 Ant3 got stuck in the morning. / $pcycle at 15:30 UT
On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work.
9, 12-13 Ant9, 12-13 need delay corrections.

Observations

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.

April 30

Observer: Caius Selhorst

Configuration: ATA feed is on Ant6.

Issues and outages

Time (UT) Antennas Details
2 Ant 2 still out with Dec controller problem.
3 Ant3 got stuck in the morning. / $pcycle at 15:39 UT
On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work.
9, 12-13 Ant9, 12-13 need delay corrections.

Observations

April 16 to June 5

No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)

Antenna availability: automatic assessment.