2026 May¶
Daily observation notes published from the eovsadata canonical log.
May 01¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| Normal startup this morning. / ACC got stuck, no IDB files from 18:30 to 20:22UT | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work. | ||
| 9, 12-13 | Ant9, 12-13 need delay corrections. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 02¶
Observer: Caius Selhorst
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 03¶
Observer: Caius Selhorst
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 04¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| Normal startup this morning. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work. | ||
| 9, 12-13 | Ant9, 12-13 need delay corrections. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 05¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| Ant1 and Ant12 weren't tracking in the morning. / They started observing at 15:30UT | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work. | ||
| 9, 12-13 | Ant9, 12-13 need delay corrections. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 06¶
Observer: Caius Selhorst
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 07¶
Observer: Caius Selhorst
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 08¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| 3 | Ant3 wasn't tracking in the morning. $pcycle at 15:17UT | |
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work. | ||
| 9, 12-13 | Ant9, 12-13 need delay corrections. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 09¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| Normal startup this morning. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work. | ||
| 9, 12-13 | Ant9, 12-13 need delay corrections. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 10¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| Normal startup this morning. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work. | ||
| 9, 12-13 | Ant9, 12-13 need delay corrections. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 11¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| Normal startup this morning. / Manlight and ROACH5 stopped at 17:50UT | ||
| New delays were set by the end of the day using Ant1 as reference. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / Mark and Charlie are trying to fix it. / Probably it'll take one week of work. | ||
| 9, 12-13 | Ant9, 12-13 need delay corrections. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 12¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| Yesterday, Manlight and ROACH5 stopped at 17:50UT / New delays were set by the end of the day using Ant1 as reference. | ||
| 13 | Ant13 is showing completely wrong RA. / All, the other antennas are tracking. | |
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / We're waiting for parts. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 13¶
Observer: Caius Selhorst
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 14¶
Observer: Caius Selhorst
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 15¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| 3 | Ant3 got stuck in the morning. $pcycle at 15:28UT | |
| On May 11th, Manlight and ROACH5 stopped at 17:50UT / New delays were set by the end of the day using Ant1 as reference. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / We're waiting for parts. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 16¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| On May 11th, Manlight and ROACH5 stopped at 17:50UT / New delays were set by the end of the day using Ant1 as reference. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / We're waiting for parts. |
Observations
Normal startup today.
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 17¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| 5 | Ant5 had Az axis lock. Rebooted at 15:10UT | |
| On May 11th, Manlight and ROACH5 stopped at 17:50UT / New delays were set by the end of the day using Ant1 as reference. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / We're waiting for parts. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 18¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| 1-6 | Ant1-6 had Az axis lock due to high winds overnight. Rebooted at 15:30UT / To test LWA noise interference: | |
| 12 and 13 | Ant12 and 13 were turned off at 23:20 UT / The other antennas were turned off after the Sunset. | |
| On May 11th, Manlight and ROACH5 stopped at 17:50UT / New delays were set by the end of the day using Ant1 as reference. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / We're waiting for parts. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 19¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| 12 and 13 | Ant12 and 13 aren't working due to an solar power inverter problem. / The inverter problem fixed at 23:00 UT, but | |
| 13 | Ant13 didn't point correctly, it's showing 00:00 for RA and Dec | |
| On May 11th, Manlight and ROACH5 stopped at 17:50UT / New delays were set by the end of the day using Ant1 as reference. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / We're waiting for parts. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 20¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| Normal startup this morning. | ||
| On May 11th, Manlight and ROACH5 stopped at 17:50UT / New delays were set by the end of the day using Ant1 as reference. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / We're waiting for parts. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 21¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| Schedule did not start at sunrise. Observing started at 15:15UT. | ||
| On May 11th, Manlight and ROACH5 stopped at 17:50UT / New delays were set by the end of the day using Ant1 as reference. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / We're waiting for parts. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 22¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| On May 11th, Manlight and ROACH5 stopped at 17:50UT / New delays were set by the end of the day using Ant1 as reference. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / We're waiting for parts. |
Observations
Normal startup today.
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 23¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| On May 11th, Manlight and ROACH5 stopped at 17:50UT / New delays were set by the end of the day using Ant1 as reference. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / We're waiting for parts. |
Observations
Normal startup today.
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 24¶
Observer: Caius Selhorst
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 25¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| Normal startup today. / Manlight and ROACH5 stopped at 17:30UT | ||
| On May 11th, Manlight and ROACH5 stopped at 17:50UT / New delays were set by the end of the day using Ant1 as reference. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / We're waiting for parts. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 26¶
Observer: Caius Selhorst
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 27¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| On May 25th, Manlight and ROACH5 stopped at 17:30UT / ADC boards were swapped between ROACHs 5 and 6 / New delays were set and the solar observations started at 20:05UT | ||
| On May 11th, Manlight and ROACH5 stopped at 17:50UT / New delays were set by the end of the day using Ant1 as reference. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / We're waiting for parts. |
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 28¶
Observer: Caius Selhorst
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 29¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| On May 25th, Manlight and ROACH5 stopped at 17:30UT / ADC boards were swapped between ROACHs 5 and 6. | ||
| On May 11th, Manlight and ROACH5 stopped at 17:50UT / New delays were set by the end of the day using Ant1 as reference. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / We're waiting for parts. |
Observations
Normal startup today.
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 30¶
Observer: Caius Selhorst
Configuration: ATA feed is on Ant6.
Issues and outages
| Time (UT) | Antennas | Details |
|---|---|---|
| 2 | Ant 2 still out with Dec controller problem. | |
| On May 25th, Manlight and ROACH5 stopped at 17:30UT / ADC boards were swapped between ROACHs 5 and 6. | ||
| On May 11th, Manlight and ROACH5 stopped at 17:50UT / New delays were set by the end of the day using Ant1 as reference. | ||
| On April 15th, the 27m has a leak in the cryogenic pump / that drained all the helium. / We're waiting for parts. |
Observations
Normal startup today.
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.
May 31¶
Observer: Caius Selhorst
Observations
April 16 to June 5
No Calibrations between April 16th and June 5th due to problems with the 27 m (Leak in the cryogenic pump lines.)
Antenna availability: automatic assessment.