Summary
The OVSA Expansion team gathered at NJIT on Apr 25-27, 2011 to present an initial "Conceptual Design" for the array and its operation. The meeting was attended by 12 team members from NJIT, UC/Berkeley, and AFRL. The agenda is shown below, with links to some of the talks.
Here are links to other meetings: Kickoff Meeting (2010 Nov. 25-27), Technical Design Meeting (2011 Nov. 07-09) , Preliminary Design Review Meeting 2012 Mar 15-17, Prototype Review Meeting (2012 Sep. 24-26)
Agenda
Monday, Apr. 25
8:30 AM Continental Breakfast
9:00 AM Overview of Project Elements, and Goals of the Meeting Get PPT file
Dale Gary, NJIT
9:30 AM Analog System and RF Signal Levels Get PPT file
Dale Gary, NJIT
10:00 AM Digital FX Correlator Get PPT file1; Get PPT file2
Dale Gary & Sam Tun, NJIT
10:30 AM Break
10:45 AM Digital Packaging Processor Get PPT file
Gordon Hurford, UC/Berkeley
11:15 AM Monitor and Control System Get PPT file
Gelu Nita , NJIT
11:45 AM Data and Database System Get PPT file
James McTiernan, UC/Berkeley
12:15 PM Lunch
1:30 PM OVSA Legacy Database
Jeongwoo Lee, NJIT
2:00 PM Site Infrastructure Get PPT file
Kjell Nelin, NJIT
2:15 PM Operator Interface and Scheduler Get PPT file
Dael Gary, NJIT
2:30 PM Antennas Get PPT file
Dale Gary, NJIT
3:00 PM Calibration Get PPT file
Dale Gary, NJIT
3:30 PM Break
4:15 PM General Discussion and planning for Tuesday work sessions
6:00 PM Adjourn
Tuesday, Apr. 26
8:30 AM Continental Breakfast
9:00 AM Science Goals
General Discussion
9:20 AM Modeling and Simulations: Overview Get PPT file
Gregory Fleishman, NJIT
9:40 AM Tools for Modeling and Simulations
Gelu Nita, NJIT
10:00 AM Connection with other Solar Science Get PPT file
Haimin Wang, NJIT
10:30 AM Break
10:45 AM Pipeline & Data Analysis – Stephen White, AFRL
11:15 AM Work Session #1 – Go through presentations one at a time and note the issues raised, discuss, and come to agreement on decision, or call for more study. Assign action items.
12:30 PM Lunch
2:00 PM Work Session #2 – Examine issues of system timing, throughput, attempt to specify usage of State Frame, updates to it, and latency.
3:30 PM Break
3:45 PM Assembling and Documenting the Concept System documentation File NB: Now superseded
5:00 PM Interface Specification System interconnect File NB: Now superseded
6:00 PM Adjourn
Wednesday, Apr. 27
8:30 AM Continental Breakfast
9:00 AM Walkthrough Test of the Conceptual Design
10:30 AM Break
10:45 AM Summary and Wrap-Up
12:00 PM Adjourn
|